Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
August 29, 2024
March 31, 2025
September 30, 2025
Multiple Locations
Paving, Site Work
No Information to Display
$319,211.00
Public - State/Provincial
Multiple Locations, Miami, FL
As per the Owner the project has been rejected. Editorial Content Team is actively seeking updated information. Counties: Miami-Dade Road Name: Concrete Installation Miami-dade County-routine Maintenance Limits: Midpoint Project(s): 42823557201(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: Description: This is a construction, reconstruction and removal of concrete sidewalk, driveways, curb cut ramps, curb & gutter, special curb & gutter, and sound/noise barrier panels on various Arterial State Roads in Miami-Dade County. The summary of pay items for this project is listed in the Bid Price Proposal. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Department's estimated quantities and the Contractors' bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. Award will be made at the Department Advertised Estimate Amount of $400,000.00. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. Question Deadline 08/22/2024 Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. FDOT - Call Order: 002 A Construction, Reconstruction and Removal of Concrete Sidewalk, Driveways, Curb & Gutters, and Sound/Noise Barrier Panels
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Miami, FL
Bid Date: Sep 20 2024
Miami, FL
Bid Date: Sep 26 2024
Miami, FL
Bid Date: Sep 16 2024
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Sep 25 2024
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Aug 29 2024
Miami, FL
Bid Date: Aug 29 2024
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Sep 23 2024
Miami, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
