Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

October 21, 2025

Multiple Locations

Site Work

No Information to Display

$800,000.00

Public - City

img_map_placeholder

Multiple Locations, Piscataway, NJ

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe to View Full Documents

Question Deadline 09/11/2024 at 12:00 PM ET Any Questions Must Be E-mailed to Purchasing@piscatawaynj.org Phone Calls Will Not Be Accepted There Will Be No Exceptions. Bid No. 2024-09-28 Below are locations with a brief description of what is likely needed for the improvement. 1. Intersection of Wyckoff Avenue and Brentwood Dr. : Install 4" PVC with a clean out to handle sump pump at house # 405 Brentwood Dr. The 4" line will be behind the curb except when it needs to cross Wyckoff Ave where it is asphalt. The distance of the 4" PVC is about 200'. All shall be restored after pipe install. The pipe depth is expected to be around 2'. It is expected that a 1' excavation bucket is used. 2. This location is to move the water from the sump pump at 484 Highland Ave. Install a clean out on the side of the house on Witherspoon. From the connection to the catch basin on Witherspoon St is about 330'. The intent is to be around 2 feet deep as utilities allow. There will be asphalt repair on crossing Roosevelt Ave and Witherspoon St as the construction will all be on the roadway. It is expected that a 1' excavation bucket is used. The inlet will need to be reset with 2 new courses of masonry. 3. This location is to move water from the sump pump at 1650 Jerome St. Install a cleanout at the connection from the house sump pump and at pipe turns. This area will require about 135' of 4" PVC. It will have to cut the roadway by Rock Avenue and tie into the Inlet on Rock Avenue from the back. To do so, there will be sidewalks that must be removed and replaced, also pavement must be removed and replaced, there will be digging in from of 1650 Jerome St., but the intent is to dig in grass area until it must cross the roadway. It is expected that a 1' excavation bucket is used. 4. 640 South Randolpville Rd there is a need of about 220' for 4" perforated pipe to allow groundwater easier access to the inlet. This work is to be performed behind the curb. 5. 81 Sturbridge Dr East, there is a need to connect the sump pump into the inlet. The run is about 80' and will be done on the roadway side. It will require saw cutting the roadway to allow a 1' bucket. The inlet will be reset with 2 new courses and a cleanout installed behind curb.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects