Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 1, 2024

June 30, 2025

Alaska Hwy

Site Work

No Information to Display

$5,000,000.00

Public - Federal

img_map_placeholder

Alaska Hwy, Sikanni Chief, BC

Our team is requesting plans for this project.

Subscribe to View Full Documents

This is the Phase 2 solicitation following an Invitation to Qualify. Only qualified suppliers have been invited to bid. The work for this requirement is to rehabilitate bridge culvert no.3 at Km 384.7 of the Alaska Highway in British Columbia. General work to be performed under this contract: 1.Removal and disposal of existing culvert materials and end walls; 2.CSP Culvert Liner supply and installation; 3.Grouting between CSP culvert liner and existing culvert; 4.SWSP culvert supply and installation with trenchless methods under the Alaska Highway; 5.Extension of SWSP culvert to beyond highway clear zone 6.Substrate retaining plate installation in SWSP culvert 7.Cast-in-place Culvert Concrete Collar End Treatment for SWSP and CSP culverts (inlet only); 8.Channel Excavation; 9.Highway widening to accommodate new concrete roadside barriers and flare, including embankment fill, road structure fill, asphalt cutting and milling, and asphalt paving; 10.Supply and placement of embankment fill and granular materials; 11.Supply and Installation of concrete roadside barriers; 12.Gabion supply and installation at inlet and outlets; 13.Placement of stream substrate in SWSP inlet and outlet channel; 14.Hydraulic seeding of disturbed embankment; 15.Permanent sediment and erosion control devices To assist with bonding and insurance requirements, this project is estimated to cost approximately between $1,000,001.00 and $5,000,000.00 (GST included). Please contact the contracting officer to get the full solicitation documentation, access information on how to bid, or if you have any questions regarding this tender opportunity.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.