Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 4, 2024

April 15, 2025

June 30, 2026

M-14 & US-23

Site Work

No Information to Display

$4,638,000.00

Public - State/Provincial

img_map_placeholder

M-14 & US-23, Ann Arbor, MI

57

6

3

Subscribe to View Full Documents

54.81 mi of freeway sign upgrades and install delineators on US-23 and M-14 from the Ohio/ Michigan state line northerly to north of the Washtenaw/Livingston County line, Monroe, Washtenaw and Livingston Counties. Net Classification Required For This Project: ** 4638 N6** In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of N4. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No STG 58033 211017A 24A0846 MIDOT - 009 - Freeway Sign Upgrades and Install Delineators on US-23 and M-14

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.