Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2024

December 16, 2024

No Information to Display

6789 Navigator Dr

Renovation

No Information to Display

$7,800,000.00

Public - State/Provincial

img_map_placeholder

6789 Navigator Dr, Goleta, CA

49

12

4

4

Subscribe to View Full Documents

Description of Work: As part of the Universitys deferred maintenance program the following three (3) buildings have been allocated funding to replace mechanical and electrical system components that are at their end of life. The scope of work identified for these buildings includes HVAC, cooling and electrical power systems that the University has identified as a priority to replace and/or upgrade. Note, the awarded Design-Build Team will enter into three separate design-build agreements, which will require its submittal of separate schedules for completion of the various design packages, construction work, approvals, and separate insurance, bonding, etc As part of the Universitys deferred maintenance program the following three (3) buildings have been allocated funding to replace mechanical and electrical system components that are at their end of life. The scope of work identified for these buildings includes HVAC, cooling and electrical power systems that the University has identified as a priority to replace and/or upgrade. Campus engaged a consulting engineer, P2S Engineering, to develop a detailed project program for each building to identify the design criteria / basis of design for the project(s): Project A:University Library Air Handling Units and other HVAC systems. Construction cost estimate is $3,300,000. Project B: Cheadle Hall Air Handling Units, HVAC components, CHW systems & Emergency Power Improvements. Construction cost estimate is $2,000,000. Project C: Phelps Hall Air Handling Units and other HVAC systems. Construction cost estimate is $2,500,000. Question Deadline 09/30/2024 at 4:00 PM PT

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects