Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 10, 2024

April 28, 2025

June 16, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$5,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Columbia Falls, MT

58

8

3

Subscribe to View Full Documents

Contract No. 04R24 Project KBP - Ashley Crk to W Reserve Dr will perform the following work: 50' long, 0.20' deep mill/fill full width at both sides of Ashley Creek Bridge (RP 3.62) and Old Reserve Dr. Bridge (RP 6.98). 50' long, 0.20' deep mill/fill full width at south end of US Hwy 2 Bridge. The north end of US Hwy 2 Bridge will receive a 40' long (up to the start of the impact attenuator in the median), 0.40' deep mill/fill full width. 200' long, 0.20' deep mill/fill of the four travel lanes and center median at a storm drain settlement location at RP 5.32 (just north of the Three Mile Drive interchange, adjacent to the gore area of the southbound off-ramp). 150' long, 0.20' deep mill/fill full width at a pedestrian underpass settlement location at RP 6.93 (at the Old Reserve Dr. Interchange). 50' long, 0.20' deep mill/fill full width at SB on-ramp and NB off-ramp across the pedestrian underpass settlement location at RP 6.93 (at the Old Reserve Dr. Interchange). Full width crack seal, chip seal and fog seal on the Kalispell Bypass (KBP) from reference post (RP) 3.6 to RP 7.5. Full width crack seal, chip seal and fog seal on the Interchange ramps for US Hwy 2, Three Mile Drive, Four Mile Drive, and Old Reserve Drive. Crack Seal and fog seal all shared-use paths, as shown in plans. New pavement markings and centerline rumble strips (in mill/fill areas on KBP only). The project begins at RP 3.6 (50' south of the southern bridge end of Ashley Creek Bridge) on the Kalispell Bypass (N-109, Alt US-93) and extends northbound for 3.9 miles to RP 7.5 (at the beginning of the PCCP, just west of the W. Reserve Dr. intersection). This project is in Flathead County. Contract to be completed as outlined in the Contract Time special provision found in the proposal. The Disadvantaged Business Enterprises contract goals are 0.00%. This project is under the jurisdiction of the Billings District Administrator. Uniform No. 10378000 MT DOT - Call Order 105 - KBP - Ashley Crk to W Reserve Dr *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects