Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

November 11, 2024

April 20, 2026

1 Ferry Building

Site Work

No Information to Display

$6,600,000.00

Public - County

img_map_placeholder

1 Ferry Building, San Francisco, CA

270

36

20

10

Subscribe to View Full Documents

San Francisco Ferry Terminal West and East Berth Ramp Rehabilitation Questions Due Date: Sep 15th 2024, 4:00 PM PDT CONTRACTOR shall perform all the Work and furnish all the labor, materials, tools, equipment, services and incidentals required to complete all the Work of construction and installation of the improvements more particularly described This public works Project consists of, in general, rehabilitating the San Francisco Ferry Terminal existing west and east berth ramps. At the west berth, the work includes refurbishing the existing hydraulic systems including refurbishing the existing hydraulic cylinders, removing and replacing existing hydraulic lines, removing and replacing existing electrical and control systems, removing and replacing existing hydraulic equipmentsuch as pumps, valves, manifolds, and tanks, and testing and commissioning the new hydraulic systems. At the east berth, the work includes disconnecting the existing steel ramp from the terminal and transporting it to an offsite facility to perform structural steel repairs as well as refurbishing the hydraulic system. The structuralsteel repairsinclude repairing cracked elements, strengthening the ramp and sandblasting and coating the steel elements, transporting and reinstalling the ramp, and performing all testing and commissioning to ensure the ramp function. Concrete repairs at the east berth are also included, all other work required to complete the Project titled San Francisco Ferry Terminal West and East Berth Ramp Rehabilitation, as shown on the Contract Plans and as specified in the Contract Documents. DBE/SBE Goal: 11.4%

48 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects