Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 29, 2024

August 21, 2024

September 27, 2024

8202 I-95

Renovation

No Information to Display

$23,255.00

Public - State/Provincial

img_map_placeholder

8202 I-95, Laurel, MD

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

As of August 15, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. This Contract provides for the Replacement of 23 Toilets at I-95s North & South, Welcome Centers, 8202 Route-95, Laurel, Maryland 20723. Remove and salvage 11 existing toilets from I-95 Welcome Center, North, and 12 existing toilets from I-95 Welcome Center, South. The contractor shall undertake the following task: The Contractor shall review site conditions before beginning any work. He shall compare his/her bid with site conditions and report any variations to the Contract Manager. Upon affirmation of site conditions, Contractor shall proceed to install the new toilets. The contractor shall remove the existing toilets. The selected contractor shall temporally cap the toilet floor drains and protect the supply lines to the toilet. The contractor shall remove and dispose of the toilets. Remove wax rings and all flooring materials down to a clean, clear floor finish. Once the toilets have been removed, the contractor shall notify the Contract Manager to review the site. Upon review of the floor by the Contract Manager, he/she shall direct the contractor to proceed. All modifications to the Scope of Work shall be documented in writing and provided to the Contract Manager. If additional Cost has been incurred, an agreement must be created between the Contractor and the Contracting Manager before work can proceed. The successful contractor shall furnish all supervision, labor, tools, transportation, equipment, hoist/crane, and materials necessary to perform all work in accordance with this specification and scope of work in the manner called for, and to the satisfaction of the State Highway Administration Office of Maintenance (OOM). Vendor is to use best practices established in the construction industry to perform this work. Contractor shall be licensed and insured to perform work in the State of Maryland. Work associated with this project shall not interfere with the maintenance facilities work under emergency summer or winter operations. Water supply shutdown preparation: Shall be coordinated with the Contract Manager. Work Schedule: Perform all work during normal work hours. Contractor shall provide to the Contract Manager a Construction Schedule for his/her approval. Contractor may request through the Contract Manager for additional hours in the day or weekend, which must be approved in writing. Cleanup: Thoroughly clean the work area each day; disposing of debris and materials responsibly. Final cleaning shall be reviewed by the Contract Manager and signed off/approved before Final Payment is approved. The Maryland State Highway Administration (SHA) is soliciting lump sum bids for removal and salvage of 12 existing toilets at I-95 Welcome Center South Side and 11 existing toilets at I-95 Welcome Center North side Restrooms Located in Savage Maryland.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.