Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 8, 2024

December 6, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$6,461,418.00

Public - County

img_map_placeholder

Multiple Locations, Renton, WA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Synopsis: This project consists of repairs and or tenant improvements at two different project sites to be constructed simultaneously. The work at the Sidney Wilson House site in Renton consists of interior and exterior repairs to an occupied building, including but not limited to building envelope repairs such as exterior insulation and finish systems, downspouts, scuppers, windows, and structural repairs; as well as interior repairs including but not limited to partitions, finishes, fixtures, and all other work in the contract documents. The work at the Federal Way Tenant Improvement site consists of alterations throughout the entire building and minor site improvements. Work on the building exterior includes but is not limited to the addition of covered shelters, a dog run, limited paving revisions, and installation of landscape planters. Work on the building interior includes but is not limited to addition of kitchen and community assembly space, increasing laundry capacity, revisions as needed to individual rooms’ kitchenettes and bathrooms, HVAC systems, life safety in accordance with code compliance, and all other work in the contract documents. Engineer’s Estimate: $6,461,418 Subcontracting Opportunities: Demolition, Concrete, Mechanical, Plumbing, Fire Protection, Electrical, Landscaping, Interior Construction and Finishing Apprenticeship Requirements: 15% minimum Apprentice Utilization Requirement. SCS Utilization Requirements. 15% minimum requirement for King County Certified Small Contractors and Suppliers (SCS). Master Community Workforce Agreement (MCWA): King County reviewed this Project and determined that a MCWA will apply, due to the nature of the work and the estimated labor costs. Priority Hire Apprentice Utilization Requirement: 27% of the total Apprentice Labor Hours worked during the contract. Priority Hire Journey Level Requirement: 17% of the total Journey Labor Hours worked during the contract. Bid Guaranty: Not less than five percent (5%) of the Total Bid Price Request for Information: Submit all inquiries via email to the Contract Specialist and cc the Alternate Contract Specialist. No verbal answers by any County personnel or its agents and consultants will be binding on the County.

31 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.