Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 11, 2024

September 30, 2024

June 15, 2025

8668 Kirtland Chardon Rd

Addition, Demolition, Site Work

No Information to Display

$273,000.00

Public - City

img_map_placeholder

8668 Kirtland Chardon Rd, Willoughby Hills, OH

17

6

5

Subscribe to View Full Documents

***Apparent low bid from previous bid opening: Millstone Management Group - $252,618 A certified check or cashiers check (Bid Check) made payable to Lake Metroparks, in an amount equal to 10% of the bid amount conditioned to provide that if the bid is accepted the bidder will enter into a proper contract for the work. Bids must be submitted in sealed envelopes and clearly marked with the Bid No. and Project Title. No bid may be withdrawn before sixty (60) days have elapsed after the Bid Opening Date. This bond shall be written on an acceptable surety company authorized to do business in the State of Ohio and in an amount equal to 100% of the contract price. Bid guaranties of all unsuccessful bidders will be held until a proper contract is entered into or until all bids are rejected, as the case may be, and will be returned immediately thereafter. The successful bidder shall be required to file, at the time a contract is entered into, a Performance Bond and Labor and Material Payment Bond. All questions concerning the Project shall be referred to - Lake Metroparks Representative: Tim Lane, Park Planner (440) 639-7275 ext. 1608 tlane@lakemetroparks.com Consultant Representative: Through Tim Lane as needed. Substantial Completion, as defined in Paragraph 4.3 & 4.5 of Board -Contractor Agreement, shall be achieved not later than the date of May 26, 2025, but not later than the Final Completion Date of June 14, 2025. Estimate of Cost - BASE BID TOTAL RANGE: $ 255,000.00 The Board reserves the right to accept separate bids on various items of work, or to accept any combination of bids, or to reject any or all bids, and to waive any technical deficiencies or irregularities in bids.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects