Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 22, 2024

December 23, 2024

August 20, 2025

18 W Liberty St

Renovation

No Information to Display

$2,700,000.00

Public - County

img_map_placeholder

18 W Liberty St, York, SC

33

13

Subscribe to View Full Documents

The Work of this project consists of furnishing all labor, materials, equipment, tools, transportation, services and incidentals; and of performing all work necessary to complete all specified work in accordance with the Contract Documents prepared therefore and entitled Planning Building HVAC Renovations. The Work of this project consists of furnishing all labor, materials, equipment, tools, transportation, services and incidentals; and of performing all work necessary to complete all specified work in accordance with the Contract Documents prepared therefore and entitled Planning Building HVAC Renovations. The work generally consists of modernization of the existing HVAC systems with associated ceiling, electrical, and fire alarm work. Existing air handlers, condensing units, ductwork, air terminals, insulation, hangers, piping, and associated accessories will be removed and replaced with new systems as described in the Contract Documents. To accommodate the HVAC renovation, the existing ceiling tiles will be removed and stored for reuse, and all existing ceiling grid will be removed and replaced. Existing ceilingmounted fixtures and devices will not be removed but will be temporarily secured in the ceiling space during construction, then reinstalled in the new grid. Existing batt insulation will be replaced with new closed-cell spray foam insulation, and selected lighting fixtures throughout the facility will be replaced.in accordance with the drawings for the York county Planning Building 18 W Liberty St, York, SC 29745 Question Deadline 10/17/2024 at 4:00 PM ET

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.