Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2024

December 2, 2024

March 3, 2026

80 Eaton St

Renovation

No Information to Display

$8,320,000.00

Public - State/Provincial

img_map_placeholder

80 Eaton St, Morrisville, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

The Project will provide replacement of original, 59-year-old boilers in the Central Heating Plant and ancillary equipment. Investigation of the underground steam piping will be surveyed to determine the piping in poor condition which shall be replaced. The project includes removal of hazardous materials and upgrades to meet current code and ADA requirements. Hamilton Hall (# 031), constructed in 1953 is a 40,251 GSF three-story building that serves as the campus' main heating plant. A study completed in December 2023 recommended steam boilers 1 & 2 be replaced with three flextube-type boilers. These boilers can be converted from steam to hydronic in the future to meet goals to eliminate fossil fuel equipment. The consultant shall confirm the recommendations of the study and explore other options. The State University Construction Fund (SUCF) is seeking Statements of Qualifications (SOQs) from consultants to provide design and construction administration services for the Rehabilitate Central Heating Plant - Hamilton Hall project at the State University of New York, College of Agriculture and Technology, Morrisville State College. The construction value is estimated at approximately $8,320,000. Minority Owned Sub-Contracting Goal: 15%. Women Owned Sub-Contracting Goal: 15%. Service-Disabled Veteran-Owned Business Contracting Goal: 6%. Contract term: 03/03/2026. Any questions regarding this procurement should be emailed to: SUCF.ConsultantProcurement@suny.edu. The deadline to submit questions is Monday, July 22, 2024, at 11:00 AM. The Fund will issue answers via email using email addresses supplied at registration.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.