Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 14, 2024

January 16, 2025

March 2, 2025

1085 Harrells Hwy

Site Work

No Information to Display

$3,000,000.00

Public - City

img_map_placeholder

1085 Harrells Hwy, Garland, NC

26

30

10

4

Subscribe to View Full Documents

Project construction will be let under the following Prime Contracts with construction including, but not limited to, the following major work items A. CONTRACT I, GENERAL WWTP IMPROVEMENTS 1. Contract I, consists of structural repair of the perimeter dikes for each lagoon, installing baffle curtain walls in each lagoon, installation of an influent bar screen, installation of a dual train chlorination contact chamber and a dechlorination system. a. DIKE STRUCTURAL REPAIRS 1) The perimeter dikes for each lagoon shall be restored to the elevations and slopes as shown on the plans. The damaged areas shall be assessed and prepared to ensure proper structural repairs are achieved, approved soil material shall be compacted in place and graded to the elevations shown. All drive areas shall be reestablished with like stone to the elevations shown on the plans. 2) Soil Test were sampled and the results are attached in the Appendix. All questions related to this bid shall be submitted in writing to bpopp@withersravenel.com prior to Wednesday, September 25th, 2024, at 5 pm to receive consideration. Contract I, General WWTP Improvements consists of structural repair of the perimeter dikes for three existing WWTP lagoons, installing baffle curtain walls in each lagoon, installation of an influent bar screen, installation of a dual train chlorination contact chamber and a dechlorination system. Contract II, WWTP Sludge Removal consists of furnishing environmental biosolids removal and disposal services, including licenses, permitting, labor, equipment, parts, materials, testing, or other incidental work for one time removal of accumulated wastewater biosolids from the existing wastewater treatment lagoons at the Town of Garland Wastewater Treatment Plant.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects