Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

February 11, 2025

March 12, 2025

Multiple Locations

Site Work

No Information to Display

$487,498.00

Public - City

img_map_placeholder

Multiple Locations, Gastonia, NC

8

8

4

5

Subscribe to View Full Documents

Project consists of the replacement of three (3) existing gravity sewer aerial crossing locations with new pipe and support piers at each location. The City of Gastonia reserves the right to reject any and all proposals. (a) The Contractor hereby agrees to furnish all of the materials, equipment and labor necessary to perform all work and install all apparatus and material set forth in the Schedule of Work a copy of which is attached to and made a part of this agreement as Exhibit "A" in strict accordance with all requirements and provisions of all contract documents as defined in the General Conditions, a copy of which is attached to and made a part of this agreement as Exhibit "B"; the Specifications together with any special provisions, conditions, and requirements contained therein, including, but not limited to, large and small scale drawings, a copy of which is attached to and made a part of this agreement as Exhibit "C"; the Bid or the Proposal of the Contractor submitted pursuant toadvertisement therefor a copy of which is attached to and made part of this agreement as Exhibit "D"; the Instructions to Bidders a copy of which is attached to and made a part of this agreement as Exhibit "E" and the forms attached to and made part of this agreement. It is the intention of the parties to this agreement that each and all of the above described Exhibits (Exhibit "A" through Exhibit "E") as well as the attached forms, be fully and completely incorporated by reference into this agreement as if fully herein set out; and it further is the intent of the parties, that by so incorporating these Exhibits unto this agreement that the parties be bound by and perform each and every requirement, provision (special or otherwise), condition, and covenant of each said Exhibit. (b) In case of discrepancy or disagreement in the contract documents, the order of precedence shall be: form of Contract, change orders, notice to proceed, special provisions, Field Guidance by Engineer, small-scale drawings, large-scale drawings, standard specifications and details, large-scale drawings, proposal, general conditions, any other documentation. Questions regarding documents, discrepancies, omissions, or intent of the specifications of drawings shall be submitted in writing to the owner through the Engineer

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.