Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
July 31, 2024
September 30, 2024
October 31, 2025
To Be Determined
Demolition, Renovation, Site Work
No Information to Display
$2,496,590.00
Public - Federal
To Be Determined, Pilot Station, AK
As of 9/20/24, this project has not yet been awarded. A timeline for award has not yet been established. Water Treatment Plant Improvements, Pilot Station, AK Work of the Project includes rehabilitation of the Pilot Station water treatment plant (WTP) distribution upgrades. Work includes, but is not limited to, the following: o Construction of temporary bypass of existing system o Demolition of existing treatment, heating, and distribution system piping o Construction of new chlorine room and replacement of existing chlorination equipment o Installation of new raw water heat addition system o Replacement of all existing distribution piping, meters, and instruments o Installation of new concrete pads for equipment as required o Installation of new mechanical and plumbing systems o Installation of new Owner supplied control panels (supplied and commissioned by ANTHC) o Modify existing well control panels as required (will be commissioned by ANTHC) o Installation of water storage tank level transducer and controls o Flush, pressure test, disinfect, and commission systems within the WTP, in coordination with ANTHC The Contractor shall furnish all labor, materials, equipment, tools, services, testing, and incidentals to complete all Work required by these Specifications and as shown on the Drawings and shall have experience with water treatment plant distribution systems. Question Deadline 07/23/2024 at 11:30 PM AKT Location : online portal. Estimated Cost Range: Owner anticipates that the Work's total bid price will be approximately $1,250,000 - $1,700,000. Anticipated Schedule: The Project has an expected substantial completion date of 30 September 2025 and final completion date of 31 October 2025. Award Statement: Award will be based on the total of all items listed on the Bid Form. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
Anchorage, AK
Bid Date: Aug 06 2024
Fort Yukon, AK
Bid Date: Sep 06 2024
Anchorage, AK
Bid Date: Oct 02 2024
Anchorage, AK
Bid Date: Sep 20 2024
Larsen Bay, AK
Bid Date: Sep 17 2024
Anchorage, AK
Bid Date: Oct 03 2024
Fairbanks, AK
Bid Date: Aug 15 2024
False Pass, AK
Bid Date: Aug 16 2024
Glennallen, AK
Bid Date: Aug 29 2024
Anchorage, AK
Bid Date: Aug 27 2024
Ketchikan, AK
--
Ketchikan, AK
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
