Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 2, 2024

October 2, 2024

November 18, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$1,344,519.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Springfield, IL

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe to View Full Documents

HMA Milling, resurfcing and patching, on Cardinal Hill Road from IL 29 to Buckhart Road, on Est Lake Shore Drive from Birkdale Drive to Long Bay Drive, and on Rochester Road from East Lake Shore Drive to Education Avenue. Region 4 District 6 Federal Project # MW87(638) VBP% 0.00 County(S) Sangamon Key Route(S) Various Marked Route(S) Section(S) 24-00174-08-FP State Job # C-96-013-25 PPS #(S) 6-10941-0000 Contract Specifics 30 Working Days Questions not accepted as of July 23, 2024 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, July 12, 2024. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IL DOT - 052 - HMA Milling, Resurfacing and Patching The proposed improvements of CH 37 - Cardinal Hill Rd are from approximately IL 29 to Buckhart Rd (CH4), CH43 - East Lake Shore Drive approximately 200ft north of the intersection at Birkdale Dr to approximately 257' south of Long Bay Drive, and CH56 - Rochester Road from the intersection with East Lake Shore Dr to Education Avenue. Work on each road consists of 2" HMA milling with a 2" HMA overlay with HMA patching work on Rochester Road. Widths vary for roadways and intersections. A nominal amount of the same pavement improvement will also be extended through the radius returns on CH4 - Buckhart Road. Net length of improvement is approximately 4.833 miles.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects