Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 14, 2024

October 14, 2024

February 14, 2025

SE 8th Ave

Paving, Site Work

No Information to Display

$147,388.00

Public - City

img_map_placeholder

SE 8th Ave, Crystal River, FL

7

12

11

4

Subscribe to View Full Documents

All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by the Engineer. Bids shall be submitted for furnishing, delivering and installing all materials, equipment and services, including labor for the Work, which generally involves the following activities: The construction of a sidewalk connecting LaGrone Park and Copeland Park, with approximately 200 LF of 8' wide 4" sidewalk and 1000 LF of 5' wide 4" sidewalk. Removing and replacing a stormwater flume along SE 8th Avenue. Removing the existing guardrail at the intersection of SE 8th Avenue and NE 1st Terrace. Removing and replacing a mitered end section at the intersection of SE 8th Avenue and NE 1st Terrace to extend culvert. The installation of landings, crosswalks, and a handrail per FDOT design standards. All qualified contractors licensed by the State of Florida are hereby invited to submit a bid on the above referenced project. The last day for questions is 5:00 PM E.T on July 29th, 2024 For more information, contact Stacy Boney, Kimley-Horn and Associates at (352) 438-3000. CONTRACT TIME: Construction time to achieve Substantial Completion is 90 consecutive calendar days from the date of the Notice to Proceed, with an additional 30 consecutive calendar days to achieve Final Completion. BID SECURITY: A 5% bid security will be required for this project. PERFORMANCE AND PAYMENT BOND: The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price. All Payment and Performance Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. The City of Crystal River reserves the right to waive formalities, waive any technical defects, reject any and all bids, and accept any bid which represents the lowest and best offer to the City.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.