Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 17, 2024

October 7, 2024

January 6, 2025

W Segerstrom Ave & S Spruce St

Site Work

No Information to Display

$642,678.00

Public - City

img_map_placeholder

W Segerstrom Ave & S Spruce St, Santa Ana, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

**As of August 27, 2024, this project has not yet been awarded. A timeline for award has not yet been established. Scope of work includes installation of traffic signal poles, conduit, wiring, fiber optic cable, video detection system, emergency vehicle preemption system, and signing & striping. Bid Proposal Guaranty shall be in the form of a cashier's or certified check payable to the City of Santa Ana, or Bid Bond issued by a corporate surety, in an amount not less than ten percent (10%) of the bid aggregate, as a guarantee that the Bidder will enter into the proposed contract if the same is awarded. The signature of the bidder on the bid bond must be notarized. Liquidated Damages 3,500 Per Calendar Day Estimated Bid Value $645,000 Start/Delivery Date October 2024 to January 2025 Project Duration 60 Working Days Online Q&A Yes Q&A Deadline 07/10/2024 2:00 PM (PDT) From the time of City Council contract award until work completion, the Contractor shall possess a valid California Class "C-10" Contractor's license. All sub-contractors shall be properly licensed for their respective trades. The City Council reserves the right to award the Contract to the bidder it has determined to be the responsible bidder submitting the lowest responsive bid, and to issue a notice to proceed with the project notwithstanding any pending or continuing challenge to its determination. This work consists of traffic signal installation or modifications and any other related work required to provide the intended operation at the locations shown on the project plans. This work shall be in accordance with the Plans, these Special Provisions, the Standard Specifications for Public Works Construction (SSPWC), Section 86 and 87 of the 2023 Caltrans Standard Specifications, the 2023 Caltrans Standard Plans, and any applicable errata (or Revised Standard Plans). The Caltrans Standard Specifications Section 86 and 87 set forth above will control the construction materials, and construction methods for specific work relating to Street Lighting, Traffic Signal Materials and Traffic Signal Systems, except as amended by the Project Plans and these Special Provisions.

26 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects