Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 18, 2024

September 16, 2024

No Information to Display

4374 Hesper Rd

Renovation

No Information to Display

$710,205.00

Public - City

img_map_placeholder

4374 Hesper Rd, Billings, MT

5

10

4

Subscribe to View Full Documents

West End Raw Water Pump Station Electrical Procurement. Question Deadline 07/11/2024 at 2:00 PM MT All questions are due by and should be directed to Project Manager, Kyle Kastelitz at kkastelitz@daconstruction.com. Description: Detailed Instructions to Bidders are included in the supplied project documents. Equipment supplied will furnish either a complete Unit Substation or individual components of electrical equipment including Medium Voltage Metal Enclosed Load Interrupter Switchgear, Liquid-Filled Power Transformer, and Switchboard for future installation at the Billings West End Raw Water Pump Station site. The equipment will be installed under a separate installation contract. Site Address: 4374 Hesper Road. Site Directions: South off Hesper Road approximately 2/3 mile west of Shiloh Road, Billings, MT. The SELLER must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to Dick Anderson Construction in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. No bid may be withdrawn after the scheduled opening of bids. Bidders Bid Form Bid Bond Agreement Form Performance Bond Payment Bond General A pre-bid meeting for all bidders will not be held. SELLER and any of the SELLER'S subcontractors bidding or doing work on this project will be required to be registered with the Montana Department of Labor and Industry (DLI). Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60) days, and to accept the lowest responsive and responsible bid which is in the best interest of Dick Anderson Construction.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.