Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 5, 2024

October 7, 2024

May 5, 2025

130 Clow International Pkwy

Renovation

No Information to Display

$200,000.00

Public - City

img_map_placeholder

130 Clow International Pkwy, Bolingbrook, IL

66

34

16

2

Subscribe to View Full Documents

As of September 25,2024, this project has not yet been awarded. A timeline for award has not yet been established. Village of Bolingbrook Clow International Airport (1c5) Partial Reimbursement for Locally Constructed 2 Box Aircraft Hangars Illinois If you have any questions concerning this report or if we may be of further service, please contact us Wang Engineering, a Terracon Company The Bid sum shall be for scope of work defined in this document. When equipment and manufacturing products are included in the bidding documents, the Bid sum shall be for the products by manufacturers named within the specification or addenda. Requests for substituting other manufacturers will be considered within but no later than twenty (20) consecutive calendar days after the Notice to Proceed and not before. Should a conflict be discovered within the Contract Documents, the CONTRACTOR shall be deemed to have estimated the highest quality way of doing the work unless he shall have asked for and obtained a decision, in writing, from the OWNER before entering into this Contract The contractor shall be responsible for cleaning and maintaining all terminal and airport access roads and using a vacuum-type mechanical sweeper on all pavements and adjacent pavements utilized during the construction process when material is tracked onto the existing pavement. The Contractor shall have a sweeper on site and always maintain all pavements clear of dirt and debris or as requested by the Resident Engineer. If the Contractor fails to comply with the Standard Specifications, Contract Plans or these Special Provisions concerning traffic control, all construction activities shall cease, and the Contractor will be required to correct the deficiencies to the satisfaction of the Resident Engineer and Owner. The Contractor shall be responsible for supplying, maintaining, and moving all barrels and/or barricades required for the staged construction as shown and detailed in the contract plans. Questions on the Project Documents shall be emailed to both Junaid Yahya junaid.yahya@kimley-horn.com and Luke Burlingame luke.burlingame@kimley-horn.com - RE: 1C5-5124 Bolingbrook Hangars. The deadline for any questions will be at the end of business on August 27th, 2024. Answers to all questions will be addressed in an Addendum and issued to all plan holders. Pre-Bid Meeting - Join on a video conferencing device Tenant key: 340760667@t.plcm.vc Video ID: 113 871 816 8

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.