Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 24, 2024

September 17, 2024

December 31, 2024

75 Rev Dr Martin Luther King Jr Boulevard.

Demolition, Renovation, Site Work

No Information to Display

$1,201,345.00

Public - State/Provincial

img_map_placeholder

75 Rev Dr Martin Luther King Jr Boulevard., Saint Paul, MN

51

11

9

7

Subscribe to View Full Documents

Upgrade Door Hardware on Perimeter Doors, Capitol Building. Responding company has completed as a Prime Contractor, the work for at least three (3) contracts which have achieved Substantial Completion since January 1, 2018, for construction in a public, government building with experience in historic preservation of finishes and materials. Each of these contracts MUST have had a construction value of $500,000 or greater. Project Manager and Job Superintendent responsible for this project EACH has had at least five (5) years of experience with public building projects similar in scope and value to this project. Each of these contracts must have had a construction value of $500,000 or greater. This Project has a 4% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. The TG/ED/VO subcontracting goal will not be a consideration in determining the lowest responsible Prime Contractor. Est. Value: $ 1,912,990.50. Est. Completion Date: Dec. 31, 2024. Site Address: 75 Rev. Dr. Martin Luther King Jr. Blvd. A. The work will be done under one prime contract that includes: General, Demolition, Electrical, Security, and Smoke Evacuation Systems construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Replacement of door hardware at existing, exterior doors, including associated electrical and low voltage wiring and devices. 2. Salvage of existing hardware components to owner. 3. Demolition and replacement of electrical wiring back to associated panels. 4. Removal of in-floor operators and waterproofing and infill of associated floor cavities. 5. Stone, copper and plaster repairs at device removal and locations for new conduit. 6. Finish carpentry and repairs at enclosures for door operators. 7. Interior painting at affected surfaces. Question Deadline 07/12/2024 at 5:00 PM CT

33 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.