Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

June 2, 2025

No Information to Display

To Be Determined

Renovation

No Information to Display

$2,800,000.00

Public - State/Provincial

img_map_placeholder

To Be Determined, Los Angeles, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

GENERAL DESCRIPTION OF WORK: Contractor shall provide waterproofing of the UCLA Cogeneration plant cooling tower concrete basins located on the Facilities Management building roof. The rooftop basins collect water from cooling towers to feed chillers that supply cooling water for campus HVAC equipment. As a part of maintenance programs, the concrete basins need a new waterproofing membrane. To comply with campus cooling need the project is intended to take place in up to (3) construction phases during the winter months where (4) concrete basins of varying sizes will need to be prepped and waterproofed. B License (General Building) The University currently anticipates executing the work of this contract in three Phases: Phase 2A is currently anticipated to occur in early 2025, Phase 2B is currently anticipated to occur Spring 2025, and Phase 2C is currently anticipated to occur Winter 2026. Contractor shall mobilize and demobilize in between each construction Phase. The CM/Contractor and University will explore alternate phasing options during Pre-Construction services. Estimated Construction Cost: $2,800,000.00 The University reserves the right to reject any or all responses to Prequalification Questionnaires and to waive non-material irregularities in any response received.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.