Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 26, 2024

September 23, 2024

June 20, 2025

Orange Grove Blvd & N Craig Ave

Outdoor Lighting, Paving, Site Work

No Information to Display

$694,249.00

Public - City

img_map_placeholder

Orange Grove Blvd & N Craig Ave, Pasadena, CA

8

9

29

6

Subscribe to View Full Documents

The project consists of the installation of a new traffic signal at Orange Grove Boulevard at Craig Avenue . The work includes furnishing and installing traffic signal standards, traffic signal cabinet and controller. It also includes furnishing and installing traffic signal equipment, video detection cameras, conduits, conductors, pull boxes, curb extensions, curb ramps, and fiber optic cables and equipment, removal of existing street light standards, sandblasting, striping, signage, and miscellaneous appurtenant work. Question Deadline 07/22/2024 at 3:30 PM PT Questions must be submitted via Online Electronic Bid bond is required. Bidders must provide all required information for the City to verify the bond with their bid. The bond must meet the following requirements and characteristics: Bid security in the amount of five-percent (5%) of the total bid price in the form of a redeemable or callable electronic surety bond, meeting City requirements, must accompany all bids. In submitting this bid, the Bidder warrants that it has work experience comparable to that which is to be performed. Prior to award of a contract, the City may request of any Bidder, a statement setting forth their work experience of a nature comparable with that which is to be performed. Such statement shall describe the work performed over the period of three (3) years preceding the date of said statement, and shall give the owner, location, and contract price, together with the dates of beginning and completion of such work. This statement of experience shall be submitted within seven (7) calendar days after the City's notification to so submit. Failure to submit an adequate statement can result in rejection of the bid as nonresponsive. The bid range is $510K to $660k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results: Traffic Signal Installation : Select Electric, Inc - $329,916.00 Civil Improvements : Alfaro Communications Construction Inc. - $172,036.55

38 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.