Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 29, 2024

August 28, 2024

October 31, 2024

2 Sears St

New Construction, Site Work

No Information to Display

$185,000.00

Public - City

img_map_placeholder

2 Sears St, Shelburne Falls, MA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe to View Full Documents

Estimated Cost $274,000 Accepting sealed bids for supply and installation of a Salt Shed per specifications at the Highway Garage located at 2 Sears St., Shelburne Falls, MA 01370. Questions will be accepted until 7/11/24. The last addendum, if any, will be issued no later than 7/15/24. Inquiries should be directed to: Heather Butler Town Administrator Select Board's Office 17 Main Street, Shelburne Falls, MA 01370(413) 625-6330 ext 5 twnadmin@town.buckland.ma.us Rigid steel frame supporting membrane covered roof and wall structure of the type described herein: a) Building must provide an envelope at least 30' tall by 20' wide in the middle of the building to allow for dumping inside b) Flat gable end on rear wall with (2) 3' x 3' passive vents c) Open in front The membrane shall be tensioned over the framework. The structure shall be rectangular in shape with vertical gable end walls. The interior of the structure below the main trusses shall be clear span free of any structural support members and shall provide unobstructed floor space. No exterior purlins, guy ropes or cables shall be used for anchoring the structure. 2. The structure shall include accessories to the extent shown on the project drawings required for the scope and intended use for: a. Overhead doorways b. Ventilation systems. c. Other structure accessories This specification covers the manufacture, shipping, handling and erection of a prefabricated membrane covered structure and concrete foundation. The specification as heretofore set forth is general in nature and scope and shall not be construed as to limit the work other than the requirement that the new re-locatable building shall match the specification in materials, appearance, configuration and details. It is the intent of this specification that the bidder shall include all labor, materials, equipment services and transportation to locate the building on the site designated with all other work. Buildings shall be complete and operating and shall include all exterior and interior materials and systems as shown or indicated in contract documents. All workmen shall be skilled and qualified for the work that they perform. All materials used, unless otherwise specified, shall be new and of the types and grades specified. The contractor shall certify that no asbestos containing building materials that exceed Federal mandated safe asbestos levels have been used in the construction of the membrane-covered structure. Work shall be performed as necessary and required for the construction of the project as indicated. Such work includes the supply and installation of a membrane-covered structure complete with exterior and interior finishes. The building shall be as dimensioned with all features and quantities as per specification.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.