Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 3, 2026

No Information to Display

FL-589

Paving, Site Work

No Information to Display

$16,895,737.00

Public - State/Provincial

img_map_placeholder

FL-589, Spring Hill, FL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

As of September 24, 2024, an engineer has been selected and this project is in the design phase. The estimated timeline for bidding is 2/6/2026 to 3/7/2026 and the estimated timeline for start of construction is 6/3/2026. 451365-1: $15,490,411 451365-2: $1,405,326 *The closed solicitation has been included below for reference: District : 08 Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Expanded Letter of Response Project Description : Resurface Suncoast Pkwy (SR589) Pasco County (MP28.5-37.3) Plain Language Description : Ad No. 25802 - Resurface Suncoast Pkwy (SR 589) in Pasco County (MP 28.5 - 37.3) (Lead ad) Ad No. 25801 - Resurface Suncoast Pkwy (SR 589) in Hillsborough County (MP 14.3 - 17.5) Ad No. 25832 - Project Description: RESURFACE TPK (SR 91) IN BROWARD COUNTY, MP 54.2-57.3 Ad No. 25803 - Resurface Suncoast Pkwy (SR 589) in Hernando County (MP 37.3 - 44.5) Response Deadline Date/Time 7/02/2024 02:30 am Longlist Date/Time 7/18/2024 08:00 pm Shortlist Selection Date/Time 7/23/2024 06:30 pm Final Selection Date/Time 8/13/2024 06:30 pm Negotiations Period Begin Date 8/17/2024 Negotiations Period Ending Date 10/17/2024 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Resurface Suncoast Pkwy (SR589) Pasco County

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.