Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 15, 2024

September 16, 2024

September 16, 2025

6211 Walther Ave

Renovation

No Information to Display

$2,613,000.00

Public - City

img_map_placeholder

6211 Walther Ave, Baltimore, MD

33

23

65

4

Subscribe to View Full Documents

As of September 24, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. A. The Work of Project is defined by the Contract Documents and consists of the following:This window and door project will provide full replacement of all the existing windows and doors in the building. The existing doors, windows and frames are from a 2000 renovation of the school, and are past their useful life. The request is to replace all 8,219 square feet of existing windows with new pre-finished aluminum windows/frames and hardware, and all exterior doorswith FRP doors, pre-finished aluminum frames and hardware, all in the existing masonry openings. The work shall meet City Schools' design standards regarding security, energy efficiency and maximum clarity of the combination thermal and security glazing. The windows at grade level shall be protected by security screening. Interior and exterior walls, including sills and lintels, shall be repaired where damaged near windows, and new window shades installed at all windows. Replacing the windows will provide a watertight environment for learning as well as increasing the buildings insulation values for thermal comfort. Exterior doors should be designed to be connected to a central monitoring system with new door contacts and wiring, an audible local alarm, and speakers with a push to talk feature, to support City Schools' security initiative. B. Exterior doors should be designed to be connected to a central monitoring system with new door contacts and wiring, an audible local alarm, and speakers with a push to talk feature, to support city schools' security initiative. C. The improved glazing is inhibiting cellular signals inside the building, so a distributed antenna system (das) for the building should also be designed as part of this project, following the district technology standards. Location of Work: Glenmount Pre-K to 8 School #235 6211 Walther Avenue Baltimore, MD 21206 MBE Participation (%) 28.00 African American MBE Participation (%) 8.0 Women-Owned MBE Participation (%) 11.0 Question Deadline 06/25/2024 at 4:00 PM ET

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.