Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 10, 2024

October 1, 2024

May 30, 2025

50 Elm St

New Construction, Site Work

No Information to Display

$2,900,000.00

Public - City

img_map_placeholder

50 Elm St, Dedham, MA

39

28

50

3

Subscribe to View Full Documents

New Construction for a Pre-engineered Metal Storage Building and Site Improvements - Sub Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Sub Bid Category Masonry, Miscellaneous and Ornamental Iron, Plumbing, Heating, Ventilating, Air-Conditioning (HVAC), Electrical, Painting Direct any questions to Ashley Carrig at RGB Architects at acarrig@rgb.net. Filed Sub-Bid questions are due by 8/30/24 @ 5:00 P.M. The project proposes to erect a 4,104 GSF prefabricated metal building with an 864 SF mezzanine for storage. The building will include a single-use toilet room, a mop sink, and a drinking fountain as an addalternate. The building consists of but is not limited to, slab-on-grade construction, structural steel framing, concrete on metal deck, light gauge steel framing insulated metal wall and roof panels, brick wainscoting, translucent panels, motorized overhead section doors, a prefabricated steel staircase, a cupola, an entry canopy, and associated electrical, mechanical, and plumbing work. Site improvements include, but are not limited to, the expansion of existing utilities, installation underground infiltration system and oil water separator, repaving and expansion of the main drives and parking area, sidewalks, installation of a new retaining wall, privacy PVC and iron fencing at the property perimeter with motorized slider gates, monument signage, and new landscaping in the front yard and at the perimeter of the new storage facility. Construction is expected to begin in October 2024, and substantial completion is expected by April 2025.

49 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.