Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 9, 2024

December 9, 2024

March 29, 2027

AR-549

Paving, Site Work

No Information to Display

$256,900,000.00

Public - State/Provincial

img_map_placeholder

AR-549, Fort Smith, AR

884

10

18

3

Subscribe to View Full Documents

The Purpose of This Project is to Construct a Four-lane Interstate Facility, Including a New Four Lane Bridge Over the Arkansas River in Crawford and Sebastian Counties. This Project Consists of Clearing And Grubbing, Removal and Disposal Items, Earthwork, Aggregate Base Course, Cement in Cement Stabilized Crushed Stone Base Course, Processing Cement Stabilized Crushed Stone Base Course, Achm Base, Binder, and Surface Courses, Cold Milling Asphalt Pavement, Approach Slabs and Gutters, Maintenance of Traffic, Concrete Ditch Paving, Minor Drainage, Guardrail, Erosion Control, Rumble Strips, Traffic Signal Items, Illumination Items, Construct One Triple Rc Box Culvert (Total Length 28.00'), Construct Two Continuous Prestressed Concrete Girder Units (Total Length 7054.34'), Pavement Marking, and Misc. Items. Routes: 549 Sections: 6 County: Crawford & Sebastian Length: 3.201 Miles in Length. Questions pertaining to projects during the advertisement period should be addressed to the Program Management Division at pmd@ardot.gov. The deadline to submit a question is the Wednesday prior to the scheduled letting date. A question submitted after the close of business on the Wednesday prior to the scheduled letting date may not receive a response. In Order to Have a Bid Considered, Contractors Must Furnish a Proposal Guaranty Consisting of Either a Bidder's Bond or a Certified or Cashier's Check in the Amount of Five Percent (5%) of the Total Amount Bid. in Order for a Bond to Be Acceptable to the Department, the Company Issuing the Bond Must Be Named in the Department of Treasury Listing of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies. the Underwriting Limitation of the Bonding Company Shall Be Adhered to. Any Excess (Between the Face Amount of the Bond and the Underwriting Limitation) Shall Be Protected by Reinsurance Provided by an Acceptable Reinsuring Company. These Contracts Are Subject to Normal Prequalification, Licensing and Bonding Requirements, Applicable Labor Laws, Non-discrimination Provisions, Wage Rate Laws and Other Federal Laws Including the Fair Labor Standards Acts of 1938. the Work Hours Act of 1962 and Title Vi of the Civil Rights Act of 1964 Also Apply. The Arkansas Department of Transportation (ARDOT) complies with all civil rights provisions of federal statutes and related authorities that prohibit discrimination in programs and activities receiving federal financial assistance. Therefore, ARDOT does not discriminate on the basis of race, sex, color, age, national origin, religion (not applicable as a protected group under the Federal Motor Carrier Safety Administration Title VI Program), disability, Limited English Proficiency (LEP), or low-income status in the admission, access to and treatment in ARDOTs programs and activities, as well as ARDOTs hiring or employment practices. Complaints of alleged discrimination and inquiries regarding ARDOTs nondiscrimination policies may be directed to Civil Rights Officer Joanna P. McFadden (ADA/504/Title VI Coordinator), P. 0. Box 2261, Little Rock, Arkansas 72203-2261, (501) 569-2298, (Voice/TTY 711), or the following email address: joanna.mcfadden@ardot.gov. The Successful Bidder Will Be Required to Complete This Contract Within Six Hundred (600) Working Days. The Department Reserves the Right to Reject Any or All Bids and to Waive Any Formalities. ARDOT - Hwy. 22 - Gun Club Rd. (F)

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects