Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

April 1, 2025

November 30, 2027

Multiple Locations

Site Work

No Information to Display

$3,600,000.00

Public - City

img_map_placeholder

Multiple Locations, Regina, SK

1

4

4

Subscribe to View Full Documents

2025-27 Cl Feeder/trunk Main Renewal Program. Cast Iron (Cl replacement) at three (3) specific site covering a total distance of roughly 3.0 kilometers. These Cl feeder/trunk mains have pipe sizes of 400 mm and 600 mm and are located under arterial or collection roads. 1. 2025: Winnipeg Street from South Railway Street to College Avenue, except for the section between 13th Avenue and 14th Avenue. The cast iron pipe on this street was installed in 1913, 1924 or 1929 and has a size of 600 mm. The two pipe sections are 1,400 m long in total. 2. 2026: College Avenue from Winnipeg Street to Elliot Street. The cast iron pipe on this street was installed in 1913 or 1931 and has a total length of 625 m. The pipe is 400 mm in size. 3. 2027: Saskatchewan Drive from Albert Street to Elphinstone Street. The pipe section was installed in 1913. The pipeline has a nominal diameter of 600 mm and a total pipe length of approximately 970 m. TIMELINE: Project is in design. Winnipeg Street between South Railway Street and 9th Avenue is scheduled for pavement in 2025, and between 9th Avenue and Victoria Avenue for pavement in 2026. The construction tender may be released in January 2025. Saskatchewan Drive is already included in the Saskatchewan Drive Corridor Improvement project. However, the work on this location was recently postponed to 2030. Due to the change, the cast iron pipe on this street is decided to be renewed separately in 2027. This schedule may further be changed if the Improvement project is moved ahead of 2030. Further update may be available early 2025. *Budget is unreleased.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.