Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

October 21, 2024

April 19, 2025

Multiple Locations

Asbestos Abatement, Demolition, Site Work

No Information to Display

$50,000.00

Public - City

img_map_placeholder

Multiple Locations, Fulton, MO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe to View Full Documents

Asbestos inspection at 5 residential structures, asbestos removal at 28 residential structures, and demolition at 36 residential structures The asbestos inspections for the non-hazarded structures to be demolished have already been completed; these reports are available to bidders. The city is bidding asbestos removal, asbestos inspections during demolition on the hazardous structures, and demolition together. The asbestos inspector must be licensed. The demolition contractor must be licensed for asbestos removal, or must partner with a licensed asbestos contractor. The asbestos inspector cannot also be the asbestos abatement contractor. After the removal of the asbestos by the licensed asbestos contractor, the demolition contractor would complete demolition of the structure. The city reserves the right to waiveany informality or reject any or all bids. Each bid must be accompanied by a bid guarantee equivalent to 5% of the bid amount. This can be secured by a bid bond or certified check and must be included with the bid. Attention of bidders is particularly called to the requirements as the conditions of employment to be observed and Section 3-DBE, Segregated Facility, Section 109, E.O. 11246, and compliance with the OSHA 10 hour construction safety course. Documentation of compliance with E-Verify is required. No bidder may withdraw their bid within 60 days after the actual date of bid opening. The City of Fulton is an Equal Opportunity Employer and invites the submission of bids from minority, women, and Section 3-owned firms. For more information, contact the city clerk at 573-592-3111. Asbestos Inspection and Removal: Each of the properties contained with this bid have already been inspected by a Missouri licensed asbestos inspector; all reports are included in this bid packet. Twenty-Seven (27) of the thirty-six (36) addresses or thirty-five (35) properties contain asbestos, requiring proper removal and disposal. Many of these locations contain friable asbestos. Five of these properties will require an asbestos inspector on site during demolition because the structure was too hazardous to access the complete interior of the building during initial environmental testing. These properties include: 108 Saults St. 422 Penn Ave. 721 Vine St. 837 Jefferson St. 903 Jefferson St. MBE (10%), WBE (10%)

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.