Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 23, 2024

December 23, 2024

July 6, 2025

378 Industrial Park Rd

New Construction, Site Work

No Information to Display

$1,804,555.00

Public - County

img_map_placeholder

378 Industrial Park Rd, Mountain City, TN

43

24

Subscribe to View Full Documents

As of July 23, 2024 this project has not yet been awarded. A timeline for the award was not yet been established. New Meat Processing Facility No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. 7. Bid Security: Each bid must be accompanied by cash, certified check of the bidder, or a bid bond prepared on the form of bid bond attached thereto, duly executed by the bidder as principal and having as surety thereon a surety company approved by the Owner, in the amount of 5% of the bid. Such cash, checks or bid bonds will be returned to all except the three lowest bidders within three days after the opening of bids, and the remaining cash, checks or bid bonds will be returned promptly after the Owner and the accepted bidder have executed the contract, or, if no award has been made within 60 days after the date of the opening of bids, upon demand of the bidder at any time thereafter, so long as he/she has not been notified of the acceptance of his/her bid. The owner reserves the right to waive any informalities or to reject any or all bids. Liquidated Damages for Failure to Enter into Contract: The successful bidder, upon his/her failure to refusal to execute and deliver the contract and bonds required within 10 days after she/he has received notice of the acceptance of his/her bid, shall forfeit to the Owner, as liquidated damages for such failure or refusal, the security deposited with his/her bid. Time of Completion and Liquidated Damages: Bidder must agree to commence work on or before a date to be specified in a written "Notice to Proceed" of the Owner and to fully complete the project within 280 consecutive calendar days thereafter. Bidder must agree also to pay as liquidated damages, the sum of $ 200.00 for each consecutive calendar day thereafter as hereinafter provided in the Supplemental General Conditions. Note that grant associated with this project requires Final Completion on or before June 30, 2025, therefore, no extensions of time will be granted for any circumstance beyond this date.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects