Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

November 25, 2024

No Information to Display

2250 Memorial Pkwy

New Construction, Site Work

No Information to Display

$40,000,000.00

Public - City

img_map_placeholder

2250 Memorial Pkwy, Portland, TX

308

42

2

Subscribe to View Full Documents

Fulton*Coastcon General Contractors invites competitive sealed proposals for the re-bid of the Gregory-Portland Independent School District New T.M. Clark Elementary School project. Project Description: New two-story 94,573 SF elementary school with a central plant & chiller yard Any questions regarding scope that occurs after receipt of the Documents must be submitted in writing to Fulton*Coastcon, P. O. Box 9486, Corpus Christi, Texas 78469, or may be faxed to (361)993-8005 or emailed to Rogelio Mellado at rmellado@fultonconst.com. Telephone calls will be accepted regarding scope issues, but responses must be confirmed in writing to be valid. Questions should be directed to Rogelio Mellado at rmellado@fultonconst.comU TH or faxed (361) 993-8005 Submission Instructions: Email Submissions: Proposals may be submitted electronically to Bids@fultonconst.com. Physical Submissions: Alternatively, proposals can be delivered in a sealed envelope to the following address: Fulton*Coastcon General Contractors 1102 2nd Street Corpus Christi, TX 78404 Proposal Requirements: Proposals must be submitted using the bid form provided in the bid manual, indicating the specific bid package being proposed. A copy of your standard bid form may also be included. Bid Submission Deadline: All proposals must be received by Fulton*Coastcon no later than 2:00 PM, Tuesday, September 24, 2024. Proposals will be privately opened following the deadline. Document Access: Plans, proposal forms, specifications, and contract documents can be obtained from Fulton*Coastcon in Corpus Christi. Scope of Work: Proposals are sought for the following scopes of work: Concrete & Forms Concrete Finishing - Polished Concrete Masonry Structural & Misc. Steel Ornamental Railing Rough Carpentry Millwork Finish Carpentry Roofing SM, WP, Spray Acoustical Insulation Metal Wall Panels Fire Stopping/Fire Safing Joint Protection Expansion Control Doors, Frames, & Hardware Doors, Frames, & Hardware Installation Access Doors and Frames Overhead/Coiling Doors & Grilles Windows - Glass/Glazing Louvers & Vents Drywall/Metal Stud/Insulation Ceramic Tile/Panels Acoustical Ceiling Flooring - VCT/Carpet Athletic Flooring Paint/VWC Marker Boards/Visual Display Boards Signage Toilet Partitions/Compartments Cubicle Tracks/Curtains Toilet Accessories Fire Protection Specialties Lockers & Benches Aluminum Canopies Flag Poles Misc. Specialties Food Service Equipment Theatre and Stage Equipment Athletic Equipment Playground Equipment Window Treatments Pre-Engineered Fabric Tension Structure Elevators Fire Suppression Plumbing Heating, Ventilating, & Air Conditioning (HVAC) Electrical Systems Telecomm/Data/Audio Visual Access Control/Video Surveillance/Security Fire Alarm Earthwork Termite Control Unit Paving Athletic and Recreational Surfacing Fences/Gates/Barriers Site Furnishings Irrigation Landscaping Utilities Wage Rates: Bidders are advised that wage rates applicable to the locality of the project are specified in the contract documents. Contractors are required to pay no less than the prevailing wage rates for each type of laborer, workman, or mechanic employed on this project. Reservation of Rights: GREGORY-PORTLAND Independent School District and Fulton*Coastcon reserve the right to reject any or all bids, to waive irregularities, and to accept the bid deemed most advantageous and in the best interest of the public. For further information or clarification, please contact Fulton*Coastcon General Contractors at the provided address or email.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects