Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 24, 2024

November 25, 2024

September 5, 2025

Multiple Locations

Paving, Renovation, Site Work

No Information to Display

$3,500,000.00

Public - City

img_map_placeholder

Multiple Locations, Charleston, SC

172

25

39

3

Subscribe to View Full Documents

DESCRIPTION OF PROJECT: Furnish all necessary labor, materials, tools, equipment, and other items required to complete the various maintenance repairs and specific upgrades to 4 parking garages in strict accordance with the contract documents dated 7/23/2024 by ADC Engineering CONSTRUCTION COST RANGE $ 2.5-3.5 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidder must agree to commence work as specified in a Notice to Proceed from the Owner and to fully complete the Base Bid and any awarded Bid Alternates within 300 days calendar days after the Date of Commencement. Bidder must agree also to pay as liquidated damages the sum of $ 1,500.00 per day for each calendar day thereafter that the Project fails to reach Substantial Completion within the time allowed. BID SECURITY If required, each bid must be accompanied by a Bid Security in the amount of not less than 5% of the Base Bid in the form of a certified cashiers check or a Bid Bond, made payable to the Owner and issued by a surety licensed to do business in the state of South Carolina. The Bid Bond must be accompanied by a certified and current Power of Attorney by the Attorney-in-Fact. The Owner shall have the right to retain the Bid Security of any or all Bidders until such time as one of the three conditions listed below have been met: 1. The Construction Contract has been executed and both Performance and Payment Bonds have been furnished, if required. 2. The specified time has elapsed so that bids may be withdrawn. 3. The Owner has rejected all bids. Question Deadline 09/05/2024 at 5:00 AM ET

19 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.