Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 19, 2024

November 11, 2024

July 14, 2025

149 SE College Pl

New Construction, Renovation, Site Work

No Information to Display

$4,912,280.00

Public - State/Provincial

img_map_placeholder

149 SE College Pl, Lake City, FL

104

27

8

5

Subscribe to View Full Documents

As of September 10, 2024, addendum 2 has been released. Construction is expected to start November 11, 2024. Project Description: The scope of work includes, but is not limited to: cutting and patching, alternates, cast-in-place concrete, masonry grout, reinforced unit masonry, structural steel, steel floor deck, cold-formed steel roof trusses, metal fabrications, metal pan stairs, aluminum handrails and railings, miscellaneous rough carpentry, finish carpentry, architectural wood casework, solid surfacing fabrications, damp proofing, blanket insulation, foamed-in-place insulation, vapor retarders, fluid applied membrane air barriers, metal walls, composite wall panels, sheet metal roofing, sheet metal flashing and trim, roof specialties, firestopping, joint protection, door schedule, hollow metal doors and frames, flush wood doors, access doors and frames, aluminum-framed entrances and storefronts, door hardware, glazing, finish schedule, gypsum board assemblies, nonstructural metal framing, cement plastering, tiling, acoustical panel ceilings, resilient flooring accessories, resilient tile, resinous flooring, carpet tile, painting and coating, specialties, signage, toilet compartments, toilet, bath and laundry accessories, metal canopies, manual roller shades, hydraulic elevators, geotechnical report, building earthwork and termite control. Civil, Structural, Mechanical, Plumbing, Fire Protection and Electrical as outlined in the documents. **Please note that this will be a federally funded project using Davis Bacon wages** Right to Waive Irregularities and Technicalities: Florida Gateway College reserves the right to waive minor irregularities and/or technicalities associated with this solicitation. The Coordinator of Procurement & Contracts of Florida Gateway College shall be the final authority regarding waivers of irregularities and technicalities. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE EXECUTIVE DIRECTOR OF HUMAN RESOURCES Cassandra Buckles at 386-754-4384, cassandra.buckles@fgc.edu, Florida Gateway College, 149 SE College Place, Lake City, Florida, 32025.

35 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.