Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 1, 2024

June 2, 2025

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$8,900,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Belmont, NC

2293

4

5

2

Subscribe to View Full Documents

The project, I-5719B / U-5800, widens I-85 to an eight-lane facility from NC 7 (Exit 23) to east of NC 273 (Exit 27) and intersection improvement at NC 7 (Main Street) and US 29 / 74 (Wilkinson Boulevard) in Belmont. Technical questions related to the RFQ package, or other project related questions, must be sent, by e-mail only, to altdelivery@ncdot.gov. For tracking purposes, questions will only be answered through e-mail requests. When making requests by e-mail, it is advisable to request a return receipt for your records. NC DOT - RFQ D/B - I-85 Widening and Intersection Improvements Anticipated Scope of Work In general, the I-5719 / U-5800 / U-6044 Design-Build Project adds lanes to I-85 from US 321 (North Chester Street - Exit 17) to east of NC 273 (Beatty Drive - Exit 27), improves the NC 7 (Main Street) and US 29 / 74 (Wilkinson Boulevard) intersection in Belmont, and widens SR 2200 (Cox Road) from I-85 to US 29 / 74 in Gaston County. The approximately 10.5-mile project provides an eight-lane divided facility along I-85. The project also reconstructs approximately 0.7 miles of railroad for Piedmont and Northern Railway. The purpose of this project is to reduce congestion and improve mobility along I-85 and improve traffic operations and safety at the NC 7 (Main Street) and / US 29 / 74 (Wilkinson Boulevard) intersection, and along SR 2200 (Cox Road) from I-85 to US 29 / 74, and the SR 2200 (Cox Road / Armstrong Park Road) / US 29 / 74 (East Franklin Boulevard) intersection. Anticipated Design-Build Procurement Schedule March 2024 - Request for Qualifications April 2024 - Announcement of Short-listed Teams and first industry draft RFP August 2024 - Final Request for Proposals October 2024 - Technical Proposals Due to NCDOT November 2024 - Letting

24 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects