Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 28, 2024

May 13, 2024

December 2, 2025

PA-18

Paving, Site Work

No Information to Display

$10,821,223.00

Public - State/Provincial

img_map_placeholder

PA-18, New Castle, PA

620

16

38

7

Subscribe to View Full Documents

This is a Partial Design Build Roadway Project. Design Activities Are Limited to: Concrete Curb Ramps for the Asphalt Mill and Resurfacing and Full Reconstruction, Drainage, Guide Rail and Barrier, Curb, Signing and Pavement Marking, Signals, Minor Structure Work, and Other Miscellaneous Construction, All Within a Length of 20,763.50 Linear Feet (3.932 Miles) as Indicated on the Approved Drawings Included in the Bid Package for State Route 0018 Section L32 (Montgomery Ave/ Liberty St/ Mahoning Ave/ Moravia St/ Jefferson St) in Lawrence County, City of New Castle, Commonwealth of Pennsylvania. This Project Being Situated as Follows: From a Point Approximately 500 Feet South of Sr 0018 (Montgomery Ave) and Sr 0108 (Mt. Jackson Rd) at Segment 0230 Offset 2089 (Station 8+00.00) to the Intersection of Sr 0018 (Wilmington Ave) and Jefferson Street at Segment 0370 Offset 0158 (Station 16+75.00). Project Cost Range: $7,500,000.00 - $9,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 8.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - RFP D/B - Liberty St, Jefferson St, Wilmi *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Anticipated NTP: 05/13/2024 Required Completion: 12/02/2025

30 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects