Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 1, 2024

September 2, 2024

December 1, 2024

2044 Danna Dr

Remodeling

No Information to Display

$50,000.00

Public - State/Provincial

img_map_placeholder

2044 Danna Dr, Collins, NY

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe to View Full Documents

Total MWBE Participation Goals: 20% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Vendor Questions due: July 29th 2024 Submit Quotes and All Quote Inquiries to: Shari Lin Pfleuger shari.lin.pfleuger@opwdd.ny.gov (716) 608-2803 Submit Job Scope questions to Project Manager: Travis Emke Travis.W.Emke@opwdd.ny.gov 716-938-6701 The home at 2044 Danna Dr, Collins, NY 14034 which is owned and operated by the WNY OPWDD, is in need of a bathroom remodel. The attached approved drawing must be followed. The construction permit is already approved through our Albany office. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 90 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned, and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of bathroom remodel before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.