Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 27, 2024

October 28, 2024

February 25, 2025

Multiple Locations

Site Work

No Information to Display

$500,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Beale AFB, CA

3

10

3

3

Subscribe to View Full Documents

FA468624Q0002,1135097 FA468624R0013 Project Title: Beale Cathodic Protection System Project Location: Beale AFB Project Title: Cathodic Protection Wells Project Location: Beale AFB The requirement is for a Cathodic Protection System for 7 water wells at Beale AFB in accordance with the provided Statement of Need dated 27 Jun 2024, and all other supporting documentation associated with this solicitation Applicable information for this solicitation includes: NAICS: 238190 Cathodic Protection Installation Magnitude: $300K - $500K Site Visit Date: 13 August 2024 at 1:00pm PDT. Meet at the 9 CONS building, 6500B st., 10 minutes before start time. RFI Due Date: 15 August 2024 at 1:00pm PDT Proposal Due Date: 28 September 2024 at 1:00pm PDT *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Scope of work: a. Design: All plans and specification shall be prepared and stamped by a CP engineer and the CP engineer of record shall oversee all aspects of construction and installation. b. The contractor shall provide a complete set of 65%, and 100%+IFC design phases including construction drawings, Specifications, detailed scope of work, design analysis, and bases of design report to construct and install a complete usable CP system for wells 1,2,4,5,6,8, and 9. c. Design shall conform with the applicable standards and environmental regulation listed below in section 19. d. Contractor shall perform all necessary coordination, meetings, site visits, survey, studies and reporting to clearly understand the historic and existing site condition to provide an appropriate design. e. Contractor shall provide the as-built design drawings at the project completion.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects