Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 8, 2024

March 10, 2024

March 9, 2025

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - Federal

img_map_placeholder

Multiple Locations, Washington, DC

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

This requirement is for services to correct the condition of the interior floor surfaces by providing carpet installation services to all existing similar floor surfaces in various assigned rooms in buildings of the White House complex and WHSC surrounding buildings as needed and selected by building management officials. Installation includes modifying, furnishing padding, and replacing government purchased broadloom carpet. Government purchased walk-off mats will be selected by GSA building management officials as included in this SOW. Purchase walk-off mats by size, design and shape as selected by GSA management officials and White House officials and provided to the carpet cleaning for rotational and cleaning purposes. In addition, this requirement is for services to correct the condition of the interior floor surfaces by providing carpet installation services to all existing similar floor surfaces in various assigned rooms in buildings of the White House complex and WHSC surrounding buildings as needed and selected by building management officials. Installation includes removing old carpet tile and replacing with new carpet tile that is either glue- down or peel and stick backing. Approximately 80% in areas of Jackson Place townhouses. Also, this requirement is to provide carpet repair services as needed and requested by GSA building management officials. Repairing includes snags, rips, patches and replacement services of carpet in various assigned rooms in all buildings of the White House complex and WHSC surrounding buildings as needed and selected by GSA building management officials. Approximately five incidents per year occur where carpet repairs are necessary. Furthermore, this requirement is for services to correct the condition of the interior floor surfaces by providing vinyl tile, luxury vinyl tile, and heterogenous sheet flooring installation services to all existing similar floor surfaces in various assigned rooms in buildings of the White House complex and WHSC surrounding buildings as needed and selected by building management officials. Installation includes removing old flooring, subfloor repair/leveling and installing new flooring material. This requirement also included the need to provide and install new cove base in areas where it is to be replaced as direct by GSA building management officials. This requirement could be a change in use of space. If a presidential transition takes place due to an election a change of occupancy of administration officials could take on a four-year cycle. Finally, this requirement could be a change in occupancy. If a presidential transition takes place due to an election a change of occupancy of administration officials could take on a four-year cycle. Base Year: 3/10/2024 - 3/9/2025

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.