Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 13, 2024

March 14, 2024

No Information to Display

Multiple Locations

Site Work

No Information to Display

$226,372.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Frankfort, KY

Our team is requesting plans for this project.

Subscribe to View Full Documents

Project Description: The project involves draining and breaching the pre-law pond and sump and grading the embankments back into the pool area. While the pond is being dewatered, the contractor should monitor of the water quality and treat the discharge if needed. A 2ft flat bottom class 2 ditch will be constructed through the regraded area down to an existing culvert, which will be replaced, into a roadside ditch. Additionally, 9' high block wall will be constructed behind the home to stabilize the hillside near the home with drainage structures. The project site has previously been disturbed by coal mining operations. Construction disturbances will be kept to a minimum utilizing the approved Best Management practices (BMP) plan with a stringently formulated sediment and erosion control program. Prior to beginning any major earth disturbance (excluding initial site preparation for access only), all silt control measures will be installed. These include silt barriers (bales & silt fence) and a temporary sediment trap at the site. Trees greater than 3" diameter at breast height will be cut for construction of the diversion ditch and grading of the pond area. All disturbed areas will be promptly revegetated at the end of construction. Road stone has been included as part of the project to maintain an existing access road to the pond sites. Estimated Project Cost: $226,372.50 Estimated Length of Project: (Substantial Completion) + 120 Calendar Days (Final Completion)

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects