Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 6, 2024

June 27, 2024

August 9, 2024

139 Rue Bertrand

Renovation

No Information to Display

$6,684,999.00

Public - State/Provincial

img_map_placeholder

139 Rue Bertrand, Quebec, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1796440 Deadline for receiving complaints: 2024-01-23 Electronically transmitted submission accepted: Yes, via the SEAO, with a document Expected duration of the contract without options (in months): 12 Estimated contract price range: $706,700 to $6,684,999 The School Service Center wishes to retain the services of a general contractor for the repair of interior finishes - phase 1957 at the Farandole school located at 139, rue Bertrand, Quebec (Quebec) G1B 1H8. The work period will be from June 27 to August 9, 2024. . Correction of deficiencies will be from August 12 to 16, 2024. . The end of construction documents must be issued between August 12 and 16, 2024. Provisional acceptance will be on August 19, 2024. . During the school break (from June 25 to August 16, 2024) day and evening work will be permitted. Throughout the duration, the contractor must ensure the cleanliness of unaffected areas (corridor, classroom, office, etc.). The main works related to this project are: This work is mainly repairs to interior finishes, electromechanical and mechanical work. Main works but not limited to: Interior finishes Repair of existing floor finishes (rooms and corridors); Wall finishing, new paint; Replacement of doors; Replacement of built-in furniture and installation of wooden lockers; Replacement of tables; ETC. Electricity: Replacement of fluorescent tube lighting with LED lighting; Layout of replaced equipment; Installation of dimmers on new lighting fixtures; Replacement of electrical wiring; ETC. Plumbing: Replacement of classroom sinks and faucets; Replacement of a water fountain; ETC. General contractor: Coordination of work; Movement and protection of property and furniture; ETC. Bid Bond 10 % is required ,Performance bond, Services and Materials bond 50% is required and Certified Check *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects