Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 8, 2024

April 8, 2024

September 12, 2024

Multiple Locations

Site Work

No Information to Display

$1,750,000.00

Public - City

img_map_placeholder

Multiple Locations, San Diego, CA

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Construction services for Tierrasanta Improv 2. This project consists of the replacement of approximately 122 LF of existing 8-inch PVC sewer main and the trenchless rehabilitation of approximately 7,608 LF (1.44 Miles) of existing 8-inch sewer mains, including the associated sewer laterals (Approximately 188) from the sewer main to the property line. Furthermore, this project will rehabilitate approximately 29 manholes, perform 14 point repairs, replace 2 existing manholes, install 6 cleanouts, 1 manhole, and several sewer lateral cleanouts as necessary to complete the lateral lining work. Lastly, this project will be replacing 1 commercial concrete driveway, install 2 Continental crosswalks, remove and replace 9 type E traffic signal loops, 5 modified type E loops and 1 type Q loop, install 2 type D curb ramps, and relocate 2 pedestrian push buttons. Estimated Construction Cost: the City's Estimated Construction Cost for This Project is $1,750,000. The Contract Time for completion of the Work shall be 148 Working Days. Type of Award: Lump Sum License Requirements: A or (C34 and C42) Bid Bond: 10.00% Payment Bond: 100.00% Performance Bond: 100.00% All certificates of insurance and endorsements required by the contract are to be provided upon issuance of the City's Notice of Intent to Award letter.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects