Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 17, 2024

March 18, 2024

September 18, 2025

Multiple Locations

Renovation

No Information to Display

$6,000,000.00

Public - Federal

img_map_placeholder

Multiple Locations, Los Alamos, NM

Our team is requesting plans for this project.

Subscribe to View Full Documents

Opportunity Amount: $5,000,000.00 to $6,000,000.00 USD The purpose of this project is to prepare the Strategic Computing Complex's electrical distribution system to support the future peak power requirements of the National Nuclear Security Administration (NNSA) and Advanced Simulation and Computer (ASC) program through 2031. The objective of the project is to install the necessary electrical gear and equipment to increase the electrical distribution system at the SCC. This project will take the 20MW power distribution being provided by the Electrical Power Capacity Upgrade project from the outside switchgear and distribute it within the facility up to the secondary switchgear. In general, this includes, new 2500/3750kVA oil-filled transformers, overhead bus, and structure located on the south side of the building. This will require modifications to the existing security fence, access road, and walk pathway. Civil Site-work will include drainage modifications. New secondary low-voltage switchgear will be installed in the free space Room 1400A. The project will be required to consider the necessary modifications to the existing fire alarm and suppression systems because of new equipment and conductor runs. Power monitoring systems shall be installed as well as an emergency power off system. per the construction documents, provide the necessary modifications to locate and install two new electrical manholes, sic new outdoor 3750kVA oil-filled transformers (GFE) and associated underground duct banks from the manholes to the transformer pad locations. Most of the south-side security fence will be demolished and replaced to accommodate the new equipment. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects