Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 15, 2025

No Information to Display

To Be Determined

Site Work

No Information to Display

$31,200,000.00

Public - Federal

img_map_placeholder

To Be Determined, Morley, AB

Our team is requesting plans for this project.

Subscribe to View Full Documents

Construction of a new lift station in North Morley to collection wastewater from North Morley to the South Morley Wastewater System and water distribution and wastewater collection extension for the South Morley System for Stoney Nation. Package 1: North Morley Wastewater System (Cu124) New Lift Station Near Existing Water Well Pump Station in North Morley With 84 M3 Equalization Storage Complete With Standby Generator on Exterior Enclosure. 1,965 M of Gravity Sewer (Does Not Include Gravity Sewer in Commercial Area) 132 M of Forcemain to Post Office Lift Station; Upgrades to Post Office Lift Station to Accept Flow From North Morley Lift Station; Coordinate With Associated Engineering on Tie-in to the Planned New Forcemain Under the River. Ae Will Complete the Design and Contract Administration for a Planned Separate Contract for the Hdd of a Watermain and Sanitary Forcemain Under the River; and decommissioning of Existing Wastewater Systems Package 2: South Morley Water and Wastewater System (Cu126) Watermain for Stage 1 Area: 700 M of 25 Mm Pvc; 900 M of 50 Mm Pvc Watermain; 200 M of 100 Mm Pvc Watermain; 800 M of 150 Mm Pvc Watermain; 3300 M of 200 Mm Pvc Watermain; 750 M of 25 Mm Pex Service Line for 18 Buildings; Directional Drilling Under Trans-Canada Highway, Including a Casing Pipe for the 200 Mm Pvc Watermain; Directional Drilling Under Mini Thni Road in to Service Existing Buildings and Homes, Including a Casing Pipe for the 200 Mm Pvc Watermain in at Least One Location; Directional Drilling Under the Existing Railway Tracks, Including a Casing Pipe for the 200 Mm Pvc Watermain; Directional Drilling Under the Existing High Pressure Natural Gas Pipelines, Located Parallel to and on the South Side of the Cp Railway; Low Pressure Trickle Feed System for 6 Buildings; and 4 Fire Hydrants. Upgrades of Existing Pumps at the Townsite WTP: Sanitary Sewer for Stage 1 Area: 6000 M of 200 Mm Pvc Sewer Main; 1000 M of 100 Mm Pvc Service Lines for 20 Buildings; Directional Drilling Under Trans-Canada Highway, Including a Casing Pipe for the 200 Mm Pvc Sewer Main; Directional Drilling Under Mini Thni Road in 1 Location to Service Lateral Mains, including a Casing Pipe for the 200 Mm Pvc Sewer Main; Directional Drilling Under the Existing Railway Tracks, Including a Casing Pipe for the 200 Mm Pvc Sewer Main; and Directional Drilling Under the Existing High Pressure Natural Gas Pipelines, Located Parallel to and on the South Side of the CP Railway. TIMELINE: The owner is currently seeking proposals from engineering consultants for planning and design services. Scope of work and schedules for tender and construction may be confirmed mid-2024, pending award of contract. *Cost to be confirmed.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects