Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 8, 2024

March 11, 2024

No Information to Display

Multiple Locations

Renovation

No Information to Display

$7,368,054.00

Public - City

img_map_placeholder

Multiple Locations, Portland, OR

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Project Addresses: Gilbert Park Elementary School, 13132 SE Ramona St, Portland, OR 97236 Gilbert Heights Elementary School, 12839 SE Holgate Blvd, Portland, OR 97236 Alice Ott Middle School, 12500 SE Ramona St, Portland, OR 97236 The District is only accepting bids from the following prequalified contractors that were selected from RFQ Number 9.20.23.1: Bremik Perlo Todd First Cascade Inline Par-Tech Brockamp Jaeger Emerick Essex Kirby Nagelhout The Work consists of Misc. Building Improvements as indicated on Contract Documents prepared by Axis Design. The Contract Documents may be examined at the District Administration Office, 11300 NE Halsey St., Portland, Oregon 97220 and at the office of AXIS Design, 11104 SE Stark St, Portland, OR 97216 (503) 284-0988. Questions will be taken, and decisions will be distributed by Addenda. This is a Contract for a Public Works Project subject to ORS 279C.800 to 279C.870. Further instructions are identified under the Instruction to Bidders in the contract documents. All bids shall comply with the requirements of Oregon Revised Statutes and the District's local Public Contract Rules, latest editions. Bids must be fully completed upon the Bid Proposal provided herein in the manner provided in the "Instructions to Bidders". Bids will not be considered unless accompanied by certified check, cashier's check, or surety bond made payable to David Douglas School District in an amount equal to 10% of the Base Bid. Interest will not be allowed on bid security. David Douglas School District reserves the right to reject all and any bids not in compliance with all prescribed public procedures and requirements and to waive informalities in this bid. Engineer's Estimate: GPES: $1,451,685 GHES: $2,890,419 AOMS: $3,025,950 Combined: $7,368,054

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.