Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 14, 2024

No Information to Display

Multiple Locations

Service, Maintenance and Supply

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, San Mateo, CA

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The City of San Mateo (City) is requesting proposals from qualified engineering firms (Consultant) to provide professional engineering services for the Stormwater Master Plan Update (Master Plan Update). The final deliverable will include a prioritized short- and long-term Capital Improvement Program (CIP) plan with detailed descriptions, planning-level cost estimates, and specific recommended order of implementation. An analysis of the current funding mechanisms and how to maximize existing funding will also be part of this Master Plan Update, as well as recommendations for developing long-term, sustainable funding strategies to maintain the City's storm drainage system infrastructure based on a review of the state of the practice in California. The main scope elements of this Master Plan Update include, but not limited to, the following: Updated surface elevations and creek/channel, and lagoon bathymetry, Criteria for establishing infrastructure deficiencies/needs, Updated hydrologic and hydraulic modeling, Prioritized flood control and infrastructure improvement recommendations, Conceptual designs for high priority projects (2-5 projects), Creek/channel maintenance recommendations, Cost estimates for recommended improvements, and Strategies for maximum funding as leverage for competitive grant opportunities. The following generalized task descriptions are presented as information only to assist consultants in preparing the proposal. In general, the scope of services is intended to provide the engineering services required for the Master Plan Update, prioritize maintenance and capital needs, and maximizing existing and projected storm water funds for storm drainage system investments in the future. A more detailed scope of services will be incorporated into the negotiated consultant agreement. If any information is unclear, please feel free to provide assumptions and state these assumptions within your proposal. Selection Complete March 15, 2024 Contract Award May 1, 2024 Any questions regarding the contract documents should be directed to: Jimmy Vo, Senior Engineer City of San Mateo - Public Works Department 330 W. 20th Avenue, San Mateo, CA 94403 jvo@cityofsanmateo.org (650) 522-7319. The method of Contractor Selection has not been Determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.