Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 15, 2024

October 15, 2024

Madison Crescent

Site Work

No Information to Display

$4,000,000.00

Public - City

img_map_placeholder

Madison Crescent, Spruce Grove, AB

Our team is requesting plans for this project.

Subscribe to View Full Documents

The existing asbestos cement watermain within Madison Crescent was installed in the late 1970's and early 1980's. The intent is to replace these watermains and replace all fire hydrants and services, including service valves or CC's. Installation of new watermain would improve the quality and circulation of the water distribution system. TIMELINE: The owner is seeking proposals from engineering consultants. Construction is planned for 2024; tender from general contractors will be issued in mid-/late spring 2024. Further update pending award of contract. *Budget is unreleased.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects