Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 8, 2024

March 11, 2024

No Information to Display

401 N Main St

Renovation

No Information to Display

$100,000.00

Public - City

img_map_placeholder

401 N Main St, Piedmont, AL

5

11

Subscribe to View Full Documents

A. General: Project name is as indicated in the Advertisement For Bids and as shown on the Contract Documents prepared by McKee & Associates, 631 S. Hull Street Montgomery, Alabama 36104. B. Contract Documents: Indicate the work of the Contract and related requirements and conditions that have an impact on the project. Related requirements and conditions that are indicated on the Contract Documents include, but are not limited to the following: 1. Existing site conditions and restrictions on use of the site including ingress and egress to the site. 2. Grading operations at the site. 3. The Contractor shall be responsible to secure the site during the execution of the work and provide proof of insurance including but not limited to General Liability, W/C, Auto, Equipment, etc. C. Summary by References: Work of the Contract can be summarized by references to the Contract, General Conditions, Supplementary Conditions, the Project Manual, Technical Specification Sections, Drawings, Addenda and modifications to the Contract Documents issued subsequent to the initial printing of this Project Manual and the Drawings, and including but not necessarily limited to, printed material referenced by any of the above. It is recognized that the Work of the Contract is also unavoidably affected or influenced by governing regulations, natural phenomenon including weather conditions, and other forces outside the contract documents. All General Contractors bidding on this project shall be required to visit the site and examine all existing conditions prior to submitting their proposal. All Bidders shall have general liability and workmans compensation insurance. Plans and specifications are for viewing purposes only. Official sets must be obtained from McKee and Associates. A certified check or Bid Bond payable to Piedmont City Schools in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000.00 must accompany the bidders proposal if over $50,000.00 dollars. Performance and statutory labor and material payment bonds will be required at the signing of the Contract All General Contractors bidding on this project shall be required to visit the site and examine all existing conditions prior to submitting their proposal. All Bidders shall have general liability and workmans compensation insurance.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.