Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 31, 2024

February 29, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$800,000.00

Public - County

img_map_placeholder

Multiple Locations, Leesville, LA

Our team is requesting plans for this project.

Subscribe to View Full Documents

Asphalt Overlay Improvement. Bid envelopes MUST be sealed and marked on outside with company name, item being bid, date and time of bid opening, and contractors license number. Failure to seal and mark bid envelopes correctly will result in your bid being rejected. The Vernon Parish Police Jury reserves the right to reject any or all bids for just cause in accordance with R.S. 38:2212 & 2214. Work to be bid: Asphalt on all prepared bases shall be completed by October 31, 2024 unless otherwise authorized by the Parish Road Manager. 1. 1.5 Asphalt Overlay (Level 1 Non-Polymer): labor, equipment, and materials to lay prime coat, 1 hot mix asphalt, Level 1 Non-Polymer asphalt overlay on 12 22 wide road on prepared base and existing asphalt, price per ton with suitable wearing coarse; 5% over run; five (5) day time limit in Vernon Parish from January 1, 2024 to December 31, 2024. Widening of intersections and turnouts MUST be priced as part of the road. Must meet LADOTD specifications. No minimum tonnage required per job. Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury. 2. 2 Asphalt Overlay (Level 1 Non-Polymer): labor, equipment, and materials to lay prime coat, 2 hot mix asphalt, Level 1 Non-Polymer asphalt overlay on 12 22 wide road on prepared base and existing asphalt, price per ton with suitable wearing coarse; 5% over run; five (5) day time limit in Vernon Parish from January 1, 2024 to December 31, 2024. Widening of intersections and turnouts MUST be priced as part of the road. Must meet LADOTD specifications. No minimum tonnage required per job. Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury. 3. Chip Seal: labor, equipment, and materials to lay sections of level and chip seal with washed granite/rhyolite Hatton Tuff over existing blacktop, 12 22 wide road from January 1, 2024 to December 31, 2024. No minimum on square yardage required per job. Must meet LADOTD specifications. Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury. 4. Lime Conditioning for Gravel or Asphalt Roads: Furnish labor, equipment, and material delivered to site to stabilize heavy clay with hydrated lime, depth and percentage to be determined by qualified laboratory on 12-22 wide Gravel or Asphalt Road base 5% over run. The top 8-12 inches deep of all roads must be reclaimed before placing Lime Conditioning from January 1, 2024 to December 31, 2024. Widening of intersections and turnouts MUST be priced as part of the road. Must meet LA-DOTD specifications. No minimum tonnage required per job. Contractor to respond and perform within five (5) days of notice from the Vernon Parish Police Jury. 5. Soil Cement Base Material for Gravel or Asphalt Roads: Furnish labor, material, and equipment delivered and distributed at site, to stabilize the existing road, percent by volume of Portland cement to be determined by a qualified laboratory, cut in on 12 22 wide Gravel or Asphalt Road base 5% over run primed and ready for asphalt, price per square yard, If Lime is not required the top 8-12 inches deep of all roads must be reclaimed before placing soil cement from January 1, 2024 to December 31, 2024. Must meet LADOTD specifications. Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury. 6. Asphalt Grinding: labor and equipment to grind up asphalt/3-shot roads, 6-12 deep. Price per square yard, from January 1, 2024 to December 31, 2024. Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.