Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 6, 2024

March 7, 2024

June 27, 2024

8340 Briarwood St

Outdoor Lighting, Renovation, Site Work

No Information to Display

$1,400,000.00

Public - City

img_map_placeholder

8340 Briarwood St, Stanton, CA

24

5

3

Subscribe to View Full Documents

This Project comprises of the furnishing of all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications, and Contract Documents to renovate Stanton's Premier Park. The general items of work to be performed hereunder consist of but not be limited to Mobilization (traffic control and construction fence); Preparation and Implementation of Best Management Practices; Grading, Obtaining Building Permits for Deferred Submittals (engineer stamped calculations, drawings, details, site plans, etc.); Concrete Work; Installation of Bio-Retention Area, Site Furnishings, Landscaping, Play Equipment (deferred submittal, certification, etc.), Exercise Equipment (deferred submittal, certification, etc.), Rubberized Play Surface, Irrigation System (certification), Electrical System, Lights (deferred submittal); and all associated work to complete this Project in its entirety. Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of Stanton as Bid Guarantee. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price. Each bond shall be in the forms set forth herein, shall be secured from a surety company that meets all State of California bonding requirements, as defined in California Code of Civil Procedure Section 995.120, and that is a California admitted surety insurer. City shall award the contract for the Project to the lowest responsive, responsible Bidder as determined by City from the Total Base Bid. City reserves the right to reject any or all Bids or to waive any irregularities or informalities in any Bids or in the bidding process. For further information, please contact Han Sol Yoo, Associate Engineer, at HYoo@StantonCA.gov (e-mail) or 714-890-4204. the prevailing rate of per diem wages is available at City Clerk and shall be made available to interested parties upon request. The successful Bidder shall post a copy of the prevailing wage rates at each job site.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects